CN

400-915-1979

HomeProducts & ApplicationsPutty Powder
Interior wall base putty
Interior wall base putty
Strong adhesion · not easy to shed powder · not easy to crack · Easy to apply

Standard for execution: JG/T 298-2010. Unopened product has a shelf life of 12 months. 

Product features: Strong adhesive force, resistant to cracking, water-resistant, excellent air permeability, effectively serving as a base layer for coating decoration. 

Applicable scenario: Treatment of the base layer of indoor walls. 

Construction Instructions: 

1· The base layer is solid, clean and free of oil stains. The newly plastered wall surface should be allowed to cure for 12 days before construction. 

2. Mix with a powder-water ratio of 1:0.23 - 0.28, then let it stand for 5 - 10 minutes before use. 

3. Single batch thickness is 2-4mm. It is applied in two layers. The recommended usage is 1.4-1.6kg per square meter. 

4. Use it up within 2 hours after stirring. Do not add dry ingredients back in. 

5. Construction environment: 5 - 40℃. Construction is prohibited during rainy days. Do not over-grind. 

6. Store in a cool, dry place, protected from moisture, rain and cold.